Description
The installation is for TCL and/or AEON Floor Standing AC of 2HP, 3HP and 5HP
The Installation Includes:
- Labor for Standard (Back-to-Back) Installation
- Original Installation Kit of the Unit with 3m of Pipes + 3m of Cables
Does Not Include:
- Trunking installation.
- Provision and installation of any extra pipes and/or cables required over and above the original installation kit on the unit as described above.
- Provision of hangers.
- Any Indoor and/or Outdoor stand required.
- Any Power Supply to the unit, socket, circuit breaker, water Heater Switch etc.
- Removal of any existing unit.
- Conduit Installation